Building Hybrid Systems with Cross-Laminated Timber and Commercial Steel Studs

Home / Blog / Building Hybrid Systems with Cross-Laminated Timber and Commercial Steel Studs
Commercial Steel Studs1

Commercial steel studs, especially when combined with cross-laminated timber (CLT), create a cost-effective and structurally optimized solution for taller buildings. 

The CLT/CFS system effectively distributes gravity and lateral loads to improve performance while reducing costs. 

With increasing demand for sustainable yet durable structures, why not shift to this hybrid system for a practical balance between innovation and reliability?

Key Takeaways:

  • The CLT/CFS hybrid system improves structural efficiency and sustainability in commercial buildings.
  • Commercial steel studs provide stable load-bearing walls that complement cross-laminated timber for optimized gravity and lateral load distribution.
  • The system meets fire and acoustic performance standards with minimal complexity and material costs.

CLT/CFS Hybrid System: The New Approach to Building

Structures ranging from 7 to 12 storeys use cross-laminated timber (CLT) floor panels supported by cold-formed steel (CFS) partitions. 

Key Specifications:

  • CFS Wall Spacing: Normally set at 12’ (3.7m) in the centre.
  • CLT Floor Panels: Aimed for double or triple-span configurations.
  • Gravity Load Resisting System (GLRS): Uses CFS barriers to support CLT floors.
  • Lateral Load Resisting System (LLRS): Options include concrete cores, steel braced frames, or mass timber shear walls depending on seismic and wind conditions. 

This platform-type construction places cross-laminated timber panels between single-storey CFS walls to create a stable and efficient load-bearing system.

Sample Project 

The ongoing Main and Cordova building in Vancouver is a prime example of the hybrid system. At 120’ (36.5m) and 11 storeys, the building includes nine levels of residential space, two mixed-use floors for commercial, office, and residential functions, and one level of underground parking and storage. 

The structural design follows a practical approach, with an L-shaped layout at the residential levels and a rectangular form below the podium transition at Level 03.

Structural Details:

  • Building Height: 120’ (36.5m)
  • Total Area: 15,855 sf (1,473m²)
  • CFS Wall Spacing: 12’ (3.7m) on centre
  • Fire Rating: Up to 2 hours for CLT panels
  • LLRS: Three concrete cores (elevator and stair shafts) running from the foundation to the roof.
  • GLRS: CFS walls and continuous CLT panels in a platform-type structure.

The builders maintain a simple, repetitive structural layout to clear load paths for gravity and lateral forces. This optimizes material efficiency while meeting fire and seismic requirements.

Breaking Down the Structural Design

The hybrid system is a different approach. It combines cross-laminated timber with cold-formed steel to create a hybrid structure. But what would the structural design look like?

Applied Gravity Loads 

The design accounts for superimposed dead loads (SID), live loads (LL), and snow loads (SL), as specified in NBCC-2015. These loads influence the CLT floor panels, CFS walls, and their connections for stability and load transfer from the upper levels to the concrete podium.

Load Considerations:

  • Superimposed Dead Loads (SID): Includes finishes, partitions, and fixed service equipment.
  • Live Loads (LL): Accounts for variable occupancy-related forces.
  • Snow Loads (SL): Determined by climate data and roof exposure.

The timber floor panels are based on CSA-O86 to guarantee adequate thickness for a two-hour fire rating while maintaining structural efficiency. 

Cold-formed steel walls follow AISI S100-16 guidelines, with load-bearing studs spaced at 12’ (3.7m) in the center. The platform-type construction allows load continuity and optimizes load distribution.

CFS Wall Panel Design

The structure accounts for applied loads, including service loads (SL), dead loads (DL), and live loads (LL), with adjustments for the continuity of floor panels. Stud heights are 10 feet (3.1m), with a yield strength of 50ksi (340MPa). Mid-point bracing is applied for local stability.

Level SL DL LL Stud Type Spacing
Roof

8.32

8.18
4.57

600S137-54

600
Level 11
24.73
13.26

600S162-97

Level 10
41.29
21.95
Level 9
57.84
30.63
Level 8
74.39
39.32
400

Stud sizes and spacing vary by level to balance loadbearing capacity and practicality. On the upper levels, a single metal stud at 600mm spacing is suitable, while lower levels require heavier sections and reduced spacing.

Vertical Movements 

Vertical movement in platform-type buildings occurs due to shrinkage and elastic and creep deformations of floor panels. Each floor sits between walls above and below, so these deformations can add up and cause extra stress on structures and connections. It also leads to issues with non-load-bearing parts.

Cold-formed steel design extends through the bottom track, leading to uneven force distribution. However, cold-formed steel walls maintain dimensional stability over time, with minimal creep or elastic movement. Most vertical movement originates from the floor panels.

Advantages of Hybrid Systems

This new approach won’t gain recognition without clear benefits. Here’s why hybrid is getting popular in commercial construction:

Structural Framing Performance

One of its key advantages is the direct force path for gravity loads. Combined-bearing interior and exterior walls can transfer forces from the roof to the foundation. This setup eliminates transfer elements for a more cost-effective and structurally sound performance.

  • It’s possible to arrange the exterior and interior walls in straight lines or follow the architectural layout, provided they remain stacked across all levels.
  • The system’s simplicity minimizes additional framing members or structural components to reduce construction complexity and costs.

A typical system features a 12-foot (3.7m) spacing, which aligns well with the requirements of residential micro-units. Compared to point-supported mass timber systems, this layout eliminates expensive column-to-column connections.

  • Point-supported systems require multiple column-to-column connections to transfer forces between floors. Increases overall connection costs.
  • Alternative solutions, such as spider or pillar connections, do not provide cost benefits over the system.

Fire and Acoustic Performances

Hybrids meet fire safety and acoustic performance standards based on existing guidelines. Metal panels comply with non-combustible construction requirements. The fire resistance rating (FRR) of metal can reach up to three hours, depending on the gypsum board layers. Cross-laminated timber panels follow CSA-O86 standards or manufacturer fire test data.

Fire Performance

Metal walls with two layers of 5/8” (15.9mm) Type X gypsum board achieve a 2-hour FRR
CLT panel fire performance per CSA-O86 guidelines

Acoustic Performance

Metal walls with 90mm fibreglass insulation reach an STC rating of 50
A CLT floor with 50mm concrete/gypcrete topping and 25mm insulation meets soundproofing requirements.

Construction Sequence

Continuous timber panels are placed directly on load-bearing walls to support the above structures. This method allows efficient and repetitive installation from the bottom to the roof level.

  • Metal barriers span only between consecutive floor levels, which reduces large temporary braces.
  • LLRS components, such as concrete cores or steel braces, are installed before or alongside the system.
  • Minimizes installation time due to the same tools and techniques used throughout the structure.

Implementation Strategy in Canada

The system integrates two well-established materials—CLT floor panels and CFS walls—offering a practical approach to structural design. Both materials comply with North American building codes. Engineers can analyze and design hybrid structures using standard guidelines, including for earthquake-prone areas.

Key considerations for implementation:

  • Code Compliance: Follows existing building codes to eliminate the need for alternative solutions.
  • Construction Method: Uses platform-type construction to separate design and analysis of axial load-bearing walls and CLT floors.
  • Structural Performance: A novel connection detail improves stability by containing vertical movement within a single floor.
  • Connection Testing: Tests on screw and spring configurations confirmed that adding lightweight steel framing products improves force distribution and prevents failure in metal tracks.
Commercial Steel Studs

Time to Implement the Hybrid System

The CLT/CFS hybrid system is a game-changer for commercial construction. It combines strength, efficiency, and sustainability. This method is ready for widespread adoption with proven performance in force distribution, fire resistance, and cost-effectiveness.

Looking to integrate hybrid systems into your next project? Vancouver Steel Stud Framing specializes in commercial steel framing solutions that align with modern construction techniques. Contact us today to experience how our expertise can support your building goals.

Frequently Asked Questions

What is the thickness of commercial metal studs required in this project?

Range from 20 to 16 gauge, with 16 gauge being the thickest. These thicker studs provide extra strength for commercial buildings.

How does the hybrid approach impact construction time and cost?

CFS involves fewer trades, while a light wood frame system requires multiple contractors for rainscreen, framing, AVM barrier, insulation, and drywall. In contrast, CFS has a single contractor handling steel studs and drywall installation. Although the timber frame requires time, adding cold steel does not significantly impact the overall construction timeline.

Are CLT and CFS sustainable?

Both are sustainable, but their environmental impacts vary. CLT shows a lower embodied carbon (EC) compared to CFS. CLT walls showed approximately 60% less global warming potential (GWP) than CFS and 55% less than traditional masonry systems.

Share: